1996 – present: Quarry stone / riprap

Graded quarry stone was placed on the coast in 1996 and 1997, although was damaged in the same year due to insufficient size and quantity for the wave exposure [4, 11]. More riprap has sporadically been added to over the years. The riprap currently in place varies in size and in some sections has been displaced from its original location [4].

Riprap on the shore at Flagpole Point. (B.Berry, July 2021)

Riprap on the shore at Flagpole Point. (B.Berry, July 2021)

Previous
Previous

1996 – 1997: Concrete footings

Next
Next

1997: Trillium report - Tuktoyaktuk erosion control using monolithic concrete slabs